The programs also incorporate a large battery at the website, to be sure extra ability could be saved to the evening, as well as a 220 kV transmission line that may link the task for the North Star sub-station, in close proximity to the place a new a hundred MW https://citypointsolar.com.au/100kw-solar-system/