As soon as your utility approves your interconnection, an installation typically lasts 1 to three times for residential rooftop; for a longer time for floor mount. A consultant from a city authorities inspects your system and presents acceptance for interconnection. As soon as both you and your decided on installer https://www.tumblr.com/solarsystemperth/775692977458872321/reliable-solar-solutions-in-wa-for-a-sustainable?source=share