The 25mm thick major metal tube is driven Along with the stop shut by a steel shoe. On achieving the expected driving resistance, a complete size cage is reduced in towards the tube and filled with substantial slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://castinsitupiles02233.ampblogs.com/cast-in-situ-piles-in-bangladesh-options-69310534